True

FYA-DEFENCE Stackwork High Cast-in Fire Collar 150mm SNAP H150S-RR

1 https://powagroup.com.au/web/image/product.template/3738/image_1920?unique=0816bdc
Days
Hours
Mins
Secs

    This combination does not exist.

    Please Sign In/Register to purchase products.


    SNAP

    Terms and Conditions
    12 Months Return Policy
    Fast Dispatch Direct to site : Same Day or 1-3 Business Days Depending on location


    SNAP H150S. The Fya-Defence Stack-work Cast In Fire Collars by PowaGroup reduce the labour costs of passive fire rating stack work pipe penetrations on concrete floors for multi-level sites.

    When you fix the correct fire collar base to the formwork on site, your pipe penetration is located, complete with its passive fire protection.

    Avoids the need for core drilling the penetrations after the floor is poured and then retro fitting fire collars to the stack work.

    Much quicker than core drilling the penetrations after the floor is poured and then retro fitting fire collars.

    PowaGroup can help you make sure you're ordering the right fire collar to match the type of pipe, the right floor type, the required FRL rating and the correct installation procedure with the project specifications and ensure your installation gets compliance sign-off.


    See "Specifications & Instructions" Tab for Installation Instructions & Drawing


    Alternate Code: 11CASTSTKH150R

    SNAP H150S. The Fya-Defence Stack-work Cast In Fire Collars by PowaGroup reduce the labour costs of passive fire rating stack work pipe penetrations on concrete floors for multi-level sites.

    When you fix the correct fire collar base to the formwork on site, your pipe penetration is located, complete with its passive fire protection.

    Avoids the need for core drilling the penetrations after the floor is poured and then retro fitting fire collars to the stack work.

    Much quicker than core drilling the penetrations after the floor is poured and then retro fitting fire collars.

    PowaGroup can help you make sure you're ordering the right fire collar to match the type of pipe, the right floor type, the required FRL rating and the correct installation procedure with the project specifications and ensure your installation gets compliance sign-off.


    See "Specifications & Instructions" Tab for Installation Instructions & Drawing


    Alternate Code: 11CASTSTKH150R

    This is a preview of the recently viewed products by the user.
    Once the user has seen at least one product this snippet will be visible.

    Recently viewed Products

    To install this Web App in your iPhone/iPad press and then Add to Home Screen.

    ' '